Club switched to concrete bench tables. There is a 8" concrete block post in the middle of the table at the front. I asked if they couldn't have just poured a sonotube full of concrete instead of this wall so we'd get more leg room. I was told it was International Benchrest rules.
Could anyone please direct me to the text specifying these International Benchrest table design regulations ? I looked and couldn't find anything.
Thanks
Could anyone please direct me to the text specifying these International Benchrest table design regulations ? I looked and couldn't find anything.
Thanks
Last edited: